We pride ourselves on our ability to provide the complete groundwork service as we have demonstrated in carrying out numerous packages up to the value of 2 million pounds.

Our services include but are not limited to;

  • Site preparation and clearance (Earthmoving and recycling)
  • Setting out (in-house Civil Engineers)
  • Drainage, Interceptors, and Pipelaying (liaising with and gaining approval of local providers such as Thames Water to work on their apparatus and system)
  • Foundations
  • Soakaways
  • Laying utility infrastructure (liasing with service providers such Telecoms/Electricity/ Gas, etc)
  • Brickwork and blockwork
  • Landscaping (hard and soft)
  • Retaining walls
  • Underpinning
  • Kerbs and Paving
  • Carpark surfaces and markings
  • 5278 Roadworks
Location Description
Photo (click to enlarge)
Kings College Hospital This is a new build project but built around an existing Theatre Block within the hospital. Access to each elevation is separate, via the crane including for all plant and materials. Apart from pile caps we had to remove a solid concrete tunnel (500mm thick walls and 700mm slab) in sections in order to release the ground for the new foundations Builders work also included for the new Helipad built on the roof of the existing 12 storey structure;

  • Composite floors (decking/ concrete)
  • Blockwork enclosures
  • Pad Stones
Click to enlarge
Oxford Brookes University Lynch Projects are currently completing the Groundworks package on this prestigious project on behalf of Oxford Brookes University. The value of works are in excess of £2m and comprise of Supply and Installation of all Groundworks, Structural alterations and Hard Landscaping, to include all Temporary Works Design and Installation
Click to enlarge
Luton Airport The Airport, becoming an increasingly important hub for the South East, aims to dramatically increase its passenger capacity by 2022. The Airport Authority have undertaken extensive redevelopment works, with Lynch Projects carrying out light demolition to Terminals, and beams, slabs, concreting on airside.
Click to enlarge
Eden School Redevelopment and refurbishment of existing school including construction of new sports hall involved LPS in carrying out Groundworks, Substructure and all external works as part of a package for Kier Construction
Click to enlarge
Bracknell Meeting House A place of worship in Berkshire. Project was to extend the existing car park area, realign kerbs, replace existing car park columns and lighting, new entrance gates, drain repairs and resurface car park. Work was carried out over a 12 week period under direction of KSP Consulting LLP and for the Client – Church of Jesus Christ of Latter Day Saints
Click to enlarge
Woking Fire Station Groundworks Package for New Build Fire Station for Woking Town.
(Piles), Groundbeams, Pad Foundations installed to carry new Steel Frame structure.
Upper Floor levels – Concrete floors on composite Steel Decking.
Click to enlarge
Weybridge Business Park Works to the Business Park were carried out by McLaughlin & Harvey on behalf of Standard Life Investments. Lynch Projects assisted in redevelopment works by carrying out the reconfiguration of the car parking areas, including drainage, kerbing, and paving works.
Click to enlarge
Spires Shopping Centre Redevelopment of the Shopping Centre involved Lynch Projects working for McLaughlin & Harvey upgrading and installing new contemporary landscaping and major improvements to the Public Areas both outside and inside the Centre.
Click to enlarge
Lansdowne School Kier secured the contract under the EFA Development Programme to demolish the existing and Design and construct a new modern 2600m2 secondary education facility in Lambeth. Lynch Projects, having worked on numerous school projects with Kier, contracted to supply and install the external Groundworks to the development.
Click to enlarge
London Business School The magnificent Grade II listed building set in the heart of London has carried out major redevelopment works to produce a modern, state of the Art, Education centre.
Working with Clifford Devlin, Lynch Projects carried out concreting works, blockworks and generic Groundworks.
Click to enlarge
Six Acres Estate Redesign/ configuration of the external areas to the estate including new kerbs/ paving/ lighting and play areas
Carried out in Phases to suit the Management of Occupiers and Traffic
New Eliptical Seating installed to form a contemporary design within the main square
Click to enlarge
Wood Street New Build Development of 22 Apartments involving the formation of traditional strip foundations to the mews house and piles/ pile caps/ beams to new flats Form suspended slabs and drainage part of which is for the diversion of a Thames Water adaptable drain passing through the site
Click to enlarge
Woodfield Traditional pad foundations for the installation of recycled pod classrooms Creation of new play areas including drainage works
Click to enlarge
Aldi Store Newquay (Cornwall)             Precast wall construction + New Hotel           
Click to enlarge
Aldi Store Aylesbury (Buckinghamshire)

Traditional steelframe and strip concrete foundations with large retaining wall works to boundary

Aldi Store Poole (Dorset) Groundworks + all ancillary works for of new commercial store in Poole. Also construction of new flats to upper levels of store